Select segment definition to view

INCLINED_NORTH Working Group 4
INCLINED_SOUTH Working Group 4
JUPITER_INCLINED_AURORA Working Group 4
JUPITER_PERIJOVEJupiter observationsWorking Group 4
JUPITER_PHASE_090 Working Group 4
JUPITER_PHASE_120_DEC Working Group 4
JUPITER_PHASE_120_INC Working Group 4
JUPITER_PHASE_135_DEC Working Group 4
JUPITER_PHASE_135_INC Working Group 4
JUPITER_PHASE_150_DEC Working Group 4
JUPITER_PHASE_150_INC Working Group 4
JUPITER_PHASE_165_DEC Working Group 4
JUPITER_PHASE_165_INC Working Group 4
JUPITER_PHASE_MAX Working Group 4
JUPITER_PHASE_MIN Working Group 4
JUPITER_MONITORING Working Group 4
PERIJOVE_DAYSIDE Working Group 4
PERIJOVE_NIGHTSIDE Working Group 4
PERIJOVE_TERMINATOR Working Group 4
STELLAR_UVS_OCC_ET GENERIC
TRAJECTORY_SEGMENTdefined segment for moon coverage tool export functionnalityGENERIC
SUN_OCC_ETEvent tool support segment definitionGENERIC
FLYBY_ETEvent tool support segment definitionGENERIC
TRANSIT_ETEvent tool support segment definitionGENERIC
EARTH_OCC_ETEvent tool support segment definitionGENERIC
STELLAR_OCC_ETEvent tool support segment definitionGENERIC
JUPITER_FD_EPHEM_GAN GENERIC
JUPITER_FD_WOLFlight dynamics wheel off-loading slot, outside of Flyby preparation and recuperationGENERIC
JUPITER_FD_TCM GENERIC
JUPITER_FD_NAV_FB GENERIC
JUPITER_FD_WOL_FBIn the last week before the fly-by a WOL slot shall be combined with the TCM slot at To– 3 days (i.e. a single 3-hr slot). Another 2-hour WOL slot shall be reserved at To + 12 hours.GENERIC
EUR_CAL_GAN_TRANSIT_PRTriple transit in front of JupiterWGX
JMAG_CALROLL5 calibration roll needed by JMAG. 2 as soon as possible after JOI. 3 during phase 5: one at the start of phase 5, the last 2 as late as possible before GOIWGX
GAN_EUR_TRANSIT_PRDouble transit in front of Jupiter (Europa, Ganymede)WGX
EUR_CAL_TRANSIT_PRDouble transit in front of Jupiter (Europa, Callisto)WGX
GAN_CAL_TRANSIT_PRDouble transit in front of Jupiter (Ganymede, Callisto)WGX

1 2 136 segment definitions   Show all