G_RS_32G8 | G_RS_32G8 | Working Group 2 |
G_RS_28G7 | G_RS_28G7 | Working Group 2 |
G_RS_27G6 | G_RS_27G6 | Working Group 2 |
G_RS_OBS | G_RS GENERIC | Working Group 2 |
G_IS_OBS | G_IS_OBS | Working Group 3 |
G_GPH_5G5 | G_GPH_5G5 | Working Group 1 |
G_GPH_3G3 | G_GPH_3G3 | Working Group 1 |
G_GPH_27G6 | G_GPH_27G6 | Working Group 1 |
JUPITER_FD_WOL | Flight dynamics wheel off-loading slot, outside of Flyby preparation and recuperation | GENERIC |
FB_THERMAL | FB_THERMAL | GENERIC |
GANYMEDE_ENA | Far approach energetic neutral atom imaging of Ganymede | Working Group 3 |
EUROPA_ENA | Far approach energetic neutral atom imaging of Europa | Working Group 3 |
CALLISTO_ENA | Far approach energetic neutral atom imaging of Callisto | Working Group 3 |
EARTH_OCC_ET | Event tool support segment definition | GENERIC |
FLYBY_ET | Event tool support segment definition | GENERIC |
STELLAR_OCC_ET | Event tool support segment definition | GENERIC |
SUN_OCC_ET | Event tool support segment definition | GENERIC |
TRANSIT_ET | Event tool support segment definition | GENERIC |
EUROPA_IONO_IS | EUROPA_IONO_IS
In situ Europa ionosphere observation | Working Group 3 |
E_RS_OBS | Europa remote sensing generic segment containing obs database link | Working Group 2 |
EUROPA_RPWI_PASSIVRAD | Europa passive radar opportunity for RPWI | Working Group 1 |
E_GPH_OBS | Europa geophysics generic containing obs database link | Working Group 1 |
EUROPA_FB_RS | Europa Flyby remote sensing | Working Group 2 |
EUROPA_FLYBY_RIME_JS | Europa active radar opportunity, jovian side | Working Group 1 |
EUROPA_FLYBY_RIME_AJS | Europa active radar opportunity, anti-jovian side | Working Group 1 |
ECLIPSE_JUPITER_THERMAL | ECLIPSE_JUPITER_THERMAL | GENERIC |
EARTH_OCC_INGRESS | Earth occultation by Jupiter. Ingress | Working Group 4 |
EARTH_OCC_EGRESS | Earth occultation by Jupiter. Egress | Working Group 4 |
EARTH_OCC | Earth occultation by Jupiter | Working Group 4 |
SPICE_ATT_GOTOEARTH_COMMS | Earth communication segment | GENERIC |
E_RS_8E2 | E_RS_8E2 | Working Group 2 |
E_RS_7E1 | E_RS_7E1 | Working Group 2 |
E_IS_OBS | E_IS_OBS | Working Group 3 |
E_GPH_8E2 | E_GPH_8E2 | Working Group 1 |
E_GPH_7E1 | E_GPH_7E1 | Working Group 1 |
GAN_CAL_TRANSIT_PR | Double transit in front of Jupiter (Ganymede, Callisto) | WGX |
GAN_EUR_TRANSIT_PR | Double transit in front of Jupiter (Europa, Ganymede) | WGX |
EUR_CAL_TRANSIT_PR | Double transit in front of Jupiter (Europa, Callisto) | WGX |
TRAJECTORY_SEGMENT | defined segment for moon coverage tool export functionnality | GENERIC |
DEFAULT_THERMAL | DEFAULT_THERMAL | GENERIC |
SPICE_ATT_JUPITER_TOUR | Default attitude during the Tour phase | GENERIC |
SPICE_ATT_GANYMEDE_PHASE | Default attitude during the Ganymede phase | GENERIC |
SPICE_ATT_GOTOJUPITER_TOUR_SUP_SOL_CONJ | Default attitude during superior solar conjunction | GENERIC |
SPICE_ATT_GOTOTRANSFER_COLD_SUP_SOL_CONJ | Default attitude during cruise phase superior solar conjunctions 'cold' | GENERIC |
SPICE_ATT_TRANSFER_HOT | Default attitude during cruise phase applicable during the hot phases | GENERIC |
SPICE_ATT_TRANSFER_COLD | Default attitude during cruise phase | GENERIC |
CALLISTO_IONO | CALLISTO_IONO
In situ Callisto ionosphere observation | Working Group 3 |
C_RS_OBS | Callisto Remote sensing GENERIC containing obs database link | Working Group 2 |
CALLISTO_RPWI_PASSIVRAD | Callisto passive radar opportunity for RPWI | Working Group 1 |
C_GPH_OBS | Callisto geophysics generic containing obs database link | Working Group 1 |
CALLISTO_FB_RS | Callisto Flyby remote sensing | Working Group 2 |
CALLISTO_FLYBY_RIME_JS | Callisto active radar opportunity, jovian side | Working Group 1 |
CALLISTO_FLYBY_RIME_AJS | Callisto active radar opportunity, anti-jovian side | Working Group 1 |
C_RS_9C2 | C_RS_9C2 | Working Group 2 |
C_RS_6C1 | C_RS_6C1 | Working Group 2 |
C_RS_33C23 | C_RS_33C23 | Working Group 2 |
C_RS_31C22 | C_RS_31C22 | Working Group 2 |
C_RS_29C20 | C_RS_29C20 | Working Group 2 |
C_RS_25C18 | C_RS_25C18 | Working Group 2 |
C_RS_24C17 | C_RS_24C17 | Working Group 2 |
C_RS_23C16 | C_RS_23C16 | Working Group 2 |
C_RS_22C15 | C_RS_22C15 | Working Group 2 |
C_RS_21C14 | C_RS_21C14 | Working Group 2 |
C_RS_20C13 | C_RS_20C13 | Working Group 2 |
C_RS_19C12 | C_RS_19C12 | Working Group 2 |
C_RS_18C11 | C_RS_18C11 | Working Group 2 |
C_RS_17C10 | C_RS_17C10 | Working Group 2 |
C_RS_16C9 | C_RS_16C9 | Working Group 2 |
C_RS_15C8 | C_RS_15C8 | Working Group 2 |
C_RS_14C7 | C_RS_14C7 | Working Group 2 |
C_RS_13C6 | C_RS_13C6 | Working Group 2 |
C_RS_12C5 | C_RS_12C5 | Working Group 2 |
C_RS_11C4 | C_RS_11C4 | Working Group 2 |
C_RS_10C3 | C_RS_10C3 | Working Group 2 |
C_IS_OBS | C_IS_OBS | Working Group 3 |
C_GPH_29C20 | C_GPH_29C20 | Working Group 1 |
C_GPH_26C19 | C_GPH_26C19 | Working Group 1 |
C_GPH_25C18 | C_GPH_25C18 | Working Group 1 |
C_GPH_24C17 | C_GPH_24C17 | Working Group 1 |
C_GPH_23C16 | C_GPH_23C13 | Working Group 1 |
C_GPH_22C15 | C_GPH_22C15 | Working Group 1 |
C_GPH_21C14 | C_GPH_21C14 | Working Group 1 |
C_GPH_19C12 | C_GPH_19C12 | Working Group 1 |
C_GPH_18C11 | C_GPH_18C11 | Working Group 1 |
C_GPH_16C9 | C_GPH_16C9 | Working Group 1 |
C_GPH_15C8 | C_GPH_15C8 | Working Group 1 |
C_GPH_14C7 | C_GPH_14C7 | Working Group 1 |
C_GPH_13C6 | C_GPH_13C6 | Working Group 1 |
C_GPH_12C5 | C_GPH_12C5 | Working Group 1 |
C_GPH_11C4 | C_GPH_11C4 | Working Group 1 |
C_GPH_10C3 | C_GPH_10C3 | Working Group 1 |
ECLIPSE_BATTERY_RECOVERY_FAST | Battery recharge after eclipse | GENERIC |
ECLIPSE_BATTERY_RECOVERY_STANDARD | Battery recharge after eclipse | GENERIC |
DL_ | assuming:
JMAG: 2.31 kbps
RPWI: 1.7*2.167 kbps (Ballparks numbers from the team)
PEP: 2 kpbs (ball park number; discussion with Gabriella at WG3 F2F meeting in Sept 2018) | GENERIC |
DL_EXT | assuming:
JMAG: 2.31 kbps
RPWI: 1.7*2.167 kbps
PEP: 2 kpbs (ball park number; discussion with Gabriella at WG3 F2F meeting in Sept 2018) | GENERIC |
CALIB | all calibrations activities to be included as part of the segmentation (e.g. calibration roll etc...) | WGX |
JMAG_CALROLL | 5 calibration roll needed by JMAG. 2 as soon as possible after JOI. 3 during phase 5: one at the start of phase 5, the last 2 as late as possible before GOI | WGX |
RECOVERY_FLYBY | 20.5 hour recovery segments to be scheduled flybys
Duration is derived from https://issues.cosmos.esa.int/juicewiki/display/SOCDEV/Downlink%2C+Recovery%2C+and+Eclipse+Scenario+Analysis | GENERIC |
BATTERY_RECHARGE | 20.5 hour recovery segments to be scheduled after very demanding periods. For the moment only after flybys and eclipses.
Duration is derived from https://issues.cosmos.esa.int/juicewiki/display/SOCDEV/Downlink%2C+Recovery%2C+and+Eclipse+Scenario+Analysis | GENERIC |
IO_MONITORING | - JANUS minimum distance = 7.00e+05 km
- MAJIS minimum distance = 8.00e+05 km
- SWI minimum distance = 6.00e+05 km (able to resolve target when angular size is > 1 mrad)
| Working Group 2 |